What HB 1337 actually allows in Redmond — how many ADUs you can build, how big, how tall, the permit timeline, the fees, and the local quirks that decide whether your backyard cottage pencils out.

2 ADUs/lotDADU up to 1000 sfHeight 24′Custom permitStreamlined via REPS, or custom

What HB 1337 lets you build in Redmond

Washington's HB 1337 took effect June 30, 2025 and overrode local zoning across King County. In Redmond that means up to 2 ADUs on a single lot, no owner-occupancy requirement, and parking handled as 1 space (waived near transit). Detached units (DADUs) can run to 1000 sf of heated space; attached units follow a different rule — up to 1,000sf.

RuleRedmond
ADUs per lot2
Owner occupancyNot required (abolished by HB 1337)
Parking1 space (waived near transit)
Max DADU size1000 sf heated
Max AADU sizeUp to 1,000sf
Max height24ft

Pre-approved plans in Redmond

No pre-approved plan program yet. Every Redmond ADU goes through a custom permit review. You (or your designer) submit a full plan set, so budget for the longer timeline below and the design work up front.

Permit timeline

Redmond permit timeline: Streamlined via REPS, or custom. Because there is no pre-approved track here, plan for a full custom review. Run the numbers for your own lot in the feasibility tool before you commit.

Fees & what you'll pay

Standard fee schedule.

Statewide, HB 1337 caps ADU impact fees at 50% of what a full house would pay — but Redmond layers its own fees and exemptions on top. The line item that surprises people most here is in the fee note above; price it before you fall in love with a floor plan.

Sewer & septic

Standard utility connection.

If your property is on septic (an on-site system, or OSS), that's the single biggest hidden risk in an ADU budget — many older septic systems are at or past their design life. The feasibility tool asks about your utilities so the estimate reflects connection or drainfield costs.

Redmond quirks worth knowing

Every city has local rules that don't show up in the headline numbers. In Redmond:

Before you call anyone: use the feasibility tool to get a planning cost range for your Redmond lot, and read what HB 1337 changed so you know which old rules no longer apply.
Redmond ADU questions

Up to 2 ADUs on a single residential lot — that can be an attached unit (AADU/MIL) plus a detached backyard cottage (DADU). HB 1337 (effective June 30, 2025) preempted Redmond's old one-ADU limits and removed owner-occupancy.

Start with the drawing

Find out what fits your Redmond lot.

Get a planning cost range and what Redmond allows under HB 1337 — before you call anyone.

Get my estimateView pricing